Foundation installation in Orem UT - walls and slabs planned around water
Starting a new build and unsure about the ground? We settle drainage and water protection for your foundation before the first pour.

What foundation installation involvesfor your new build in Orem


Most people who call about foundation installation in Orem are building a house, an addition or a garage, and they want to know the ground won't cause trouble later. A foundation is the concrete walls and slab everything else sits on, and the walls have to be built for the push of the soil filled back in around them.
At Driveline Orem Concrete, I treat water as part of the foundation plan from day one, from drainage to protecting the walls below ground, because it's a lot harder to deal with once the house is up. Wet ground pushes harder on walls than dry ground, so the drainage plan and the wall design have to agree before the crew digs.
The price comes down to the building's size, how deep the walls go, how much digging the lot needs and what drainage and waterproofing the ground calls for. The schedule turns mostly on the city's permit and the weather. The estimate I write up shows what's included and what isn't, so you know what you're paying for before we pour.
You can count on straight answers about your lot and your foundation plan, so give us a call at (385) 533-2723.
The foundations we build and pour
Every foundation starts from what's going on top of it and what the ground is like underneath, so I plan the walls, slab and water protection around both before anyone digs.
Basement walls
Full-height concrete walls hold back the soil around a basement, so we build them for that push and plan the drainage and wall protection right along with them.
Footings and stem walls
The concrete footings spread the building's weight into the ground, and short stem walls rise from them for a crawlspace or garage, with the grade set so water runs away from the house.
Shops and commercial buildings
Property owners putting up a shop or small commercial building get the same planning for soil and water, and we can pour the parking lot around it when the job calls for one.

Why people hire Driveline Orem Concretefor a new foundation
Working with us means plain answers, a written bid you can follow line by line, and a lot of questions from me about your lot before we talk about the pour.
One plans it, one runs it
I plan the foundation with you, and our crew lead runs the work on site, so you always know who to ask about the plan and who to ask about the day.
In business since 2013
I started out quoting jobs at a concrete supply yard, learned the work on a crew, and started this company in 2013 so I could stand next to the truck.
Licensed and insured on every job
We're licensed and insured, and I'm glad to show you the paperwork before our crew sets a single form on your lot.
Awkward lots are our kind of job
We're known for taking on work that doesn't fit the usual mold, and I'd rather ask why the ground acts the way it does than price a guess.
Your satisfaction, guaranteed
That's our promise on every foundation we pour, and it's why I want your questions answered before the crew starts, not after the walls are up.
Plan your new foundation with uson your lot in Orem
Send the lot address, the planned building size and any soils report you have, and we'll reply within one business day to set up a free estimate at your lot. There's no pressure to book once you've seen it.
How a foundation job runsfrom your call to the walkthrough
I keep it simple by putting the whole plan in writing first, so you know what's included, what isn't and who's doing what before anyone digs.
You call or message us
Call (385) 533-2723 or use the form, tell us about the lot and what you're building, and we'll get back to you to set a time to come out.
I look at the lot
I come out, walk the lot, ask a lot of questions about the build and the ground, and write up an estimate that shows what's included and what isn't.
We sort out the city's part
Once you're ready, we take care of whatever the city needs for your foundation and put the job on the schedule with you.
Our crew lead runs the work
Our crew lead runs the dig, the forms, the drainage and the pour, and keeps you posted when weather or the city's schedule moves a day.
We walk it together
When the work's done, I walk the finished foundation with you, go over the drainage and wall protection, and answer anything before the framers take over.
Foundation questions we hear
Why does drainage matter for a new foundation in Orem?
Drainage keeps the push of the soil on your foundation walls close to what the walls were built to hold. Wet weather, changes to the house's systems or a rising water table can raise that pressure a lot, and water that gets in below ground is hard and expensive to fix once the project is finished. That's why we settle drainage and wall protection while the walls are still open.
Are cracks in a new concrete foundation a problem?
Usually not, because cracks in concrete walls and slabs are common and most aren't a cause for alarm. Cracking can be cut down a lot and kept to planned lines with control joints, which are cuts that give the concrete a place to crack, but it can't be stopped entirely. I'd rather tell you that up front than have a hairline crack surprise you.
How do I get a building permit for a foundation in Orem?
The City of Orem takes building permits online, so the application goes through an account you create in the city's online submittal system. After registering, you can check on the application and schedule or view inspections through the city's permit portal. If you're building without a general contractor, the city has an Owner-Builder Certification, though it isn't allowed on commercial projects. We check with the city before we schedule your job, and when a permit is called for, we handle the paperwork and set up inspections with you.
Can Utah soil or groundwater damage a foundation?
Yes, the Utah Geological Survey says problem soils across the state, such as expansive, compressible and collapsible soils, can do extensive damage to foundations. Collapsible soils are strong when dry but can settle a lot once water reaches them, and an older survey article names a rising shallow water table from high streams and lakes, heavy precipitation or too much irrigation as the major flooding hazard to basements. The survey's hazard maps only cover certain study areas, so a lot with no mapped data can still have hazards, which is one reason a soils report for your lot helps.
How much does foundation installation cost in Orem?
There's no single price, because it turns on the size of the building, the wall height and what your lot needs for digging and drainage. The place I'd steer you away from cutting is the drainage and wall protection, because they're buried on day one and they're the hardest part to add later. Your estimate lists each piece so you can see where the money goes.
How long does it take to install a foundation?
Longer than the pour itself, because the foundation standards require the walls to be supported at the top and bottom, or braced, before any soil goes back against them. The concrete also needs curing time, the wait while it gains strength, before it carries much weight. The permit and the weather set the start date, and I'll walk you through the order of things at the estimate.
Foundation installation around Orem
We're based in Orem and build foundations in Provo, Lehi, Spanish Fork and the other cities around them. Pick your city below, or give us a call if you don't see it listed.
Book your foundation estimate in Oremwhile your plans are on paper
Calling before your build date is set gives us room to work drainage and wall protection into your foundation installation and to check with the city first, instead of squeezing them in around a schedule that's already fixed.
